Contact Support

How to edit Power BI slicer values from PowerPoint and Word

Updated November 24th, 2026

Editing slicer values changes the data shown in exported Power BI visuals, directly from PowerPoint or Word. A presentation built for one country, client, or month can be reused for another without having to import the visuals again.

Understand the Power BI terms

Power BI uses several elements to organize and filter data. Each one behaves differently once its visuals are exported with UpSlide.

  • Report: A Power BI file published online, made of one or more pages.
  • Page: One screen of a report. Pages appear as tabs at the bottom of the report, so the Update Links pane lists the page name as Tab title. They can be exported as a whole.
  • Visual: A chart, table, or card on a page. Each visual is exported separately to PowerPoint or Word.
  • Filter: A rule that limits the data shown in visuals, for example, “Region is Europe.” The report builder sets filters in the Filters pane, and they’re often hidden from people reading the report.
  • Slicer: A visual that people reading the report click to filter the other visuals on the page, for example by country, period, or product.
  • Bookmark: A saved state of a page, including its filters, slicers, and visuals.

The Update Links pane shows all filters and slicers applied to an exported visual, but only slicer values can be edited. To change a value later in PowerPoint or Word, such as the month or the country, set it as a slicer in the report rather than as a filter.

Bookmarks work the same way. Bookmarks cannot be changed in UpSlide, but the slicer combination they generate can be used in the UpSlide import window and edited later. Bookmarks based on filters work the same way, but their values can’t be edited.

Edit slicer values

Check which slicers can be edited

Only the following slicer types can be edited from the Update Links pane:

  • Single value slicers.
  • Multiple value slicers.
  • Time-interval slicers.

Edit single and multiple value slicers

Slicer values are edited from the Update Links pane in PowerPoint or Word. The steps depend on the slicer type. Click Edit slicer values in the top-right corner to see the slicers available for update. You can edit slicer values by typing a value in the field, or selecting it from the dropdown menu.

You can decide whether to apply the change to all affected visuals or a selected few by clicking the Visuals affected dropdown. Click Apply & Update to apply the changes to the selected visuals.

Note

A manually typed value must exactly match a value in the Power BI slicer, including capital letters and spaces. Otherwise, the visual shows an error when it updates.

Edit time-interval slicers

Time-interval slicers are edited by changing their start and end dates. This is useful for moving a report from one period to the next. If no start date is entered, the slicer uses the earliest date in the report. If no end date is entered, it uses the latest date in the report.

Previous
How to link Power BI visuals and pages to PowerPoint and Word
Next
How to prepare a Power BI report for the Power BI link